62A−
90% range 57.7–66.8
LDA Consultants
Primary kind of workMixed / general
activefeaturedhigh confidence
Sub-scores
Inspections54
typical
Failed / re-inspection results on 14% of inspections vs 17% expected for similar jobs
Plan quality / Revisions60
better than peers
0.85 plan send-backs / revision events per permit vs 1.47 expected for similar jobs
Time to permit64
better than peers
Median 10 days to approval vs 21 days peer median (0.50× after adjusting for kind of work)
Completion47
typical
11% of issued permits expired/voided without final vs 9% expected
More: compliance & reliability
Compliance77
better than peers
0.02 license/insurance/stop-work type holds per permit vs 0.14 expected
Reliability42
worse than peers
7% of inspections cancelled vs 5% expected
Ann Arbor activity & plain stats
Permits in scored set
34
Last 3 years
23
Last 12 months
7
Years active
6
2021–2026
Median days to approval
10
peer median 21.0
Permits needing a revision
44%
Permits with a failed / re-inspection
18%
Inspections on record
66
Job mix
Commercial alterations 44% Foundation / structural 15% Decks & porches 9% Commercial new 9% Roofing 9% Remodels 9% Windows & doors 3% Radon 3%
Score by kind of work
Commercial alterations · 15 permits
61
Foundation / structural · 5 permits
58
Sample permit records
| Permit | Kind of work | Applied | Status | Days to approval | Notes |
|---|---|---|---|---|---|
| BLDGC26-0373 | Commercial alterations | 2026-07-06 | Final | 49 | plan submittal v2 requires re-submit plan submittal v1 requires re-submit 9 eReview file(s) sent back for resubmittal |
| BLDGC23-0274 | Commercial alterations | 2023-06-15 | Final | 7 | inspection Rough-In [BLD]: Re-inspection required plan submittal v1 requires re-submit 1 eReview file(s) sent back for resubmittal |
| BLDGC26-0499 | Decks & porches | 2026-09-14 | In Review | — | plan submittal v1 requires re-submit 2 eReview file(s) sent back for resubmittal Permit placed on hold for more information |
| BLDGC22-2363 | Foundation / structural | 2022-11-28 | Final | 3 | — |
| BLDGC22-2364 | Foundation / structural | 2022-11-28 | Final | 3 | — |
| BLDG21-0033 | Windows & doors | 2021-01-06 | ON HOLD | — | — |
Related Mixed / general firms
60A−
Robert Darvas Associates
Mixed / general work
occasionalhigh confidence
58B+
Composition Workshop INC
Mixed / general work
activemedium confidence
57B+
Angelini & Associates Architects
Mixed / general work
activefeaturedhigh confidence
57B+
Edwin R. Wier, Architect
Mixed / general work
activefeaturedhigh confidence
53B−
Wagner Engineering, LLC
Mixed / general work
activefeaturedmedium confidence