Ann Arbor Permit Report Cards

← All ratings

39D
90% range 37.3–44.9

VASQUEZ CONSTRUCTION

General Contractor · Ypsilanti, MI · #427 of 440 listed overall
Primary kind of workMixed / generalNo single kind of work is 50%+ of all permits · #98 of 100 mixed / general firms
occasionalmedium confidence

Overall score: 50 = peer average for the same role and the same kind of work (e.g. window jobs are compared with window jobs, remodels with remodels). Based on 10 permits (3 STREAM + 7 A2Trak).

Sub-scores

Inspections28
worse than peers
Failed / re-inspection results on 51% of inspections vs 14% expected for similar jobs
Plan quality / Revisions34
worse than peers
2.52 plan send-backs / revision events per permit vs 0.78 expected for similar jobs
Time to permit34
worse than peers
Median 33 days to approval vs 10.5 days peer median (3.82× after adjusting for kind of work)
Completion48
typical
22% of issued permits expired/voided without final vs 18% expected
More: compliance & reliability
Compliance64
better than peers
0.00 license/insurance/stop-work type holds per permit vs 0.03 expected
Reliability46
typical
6% of inspections cancelled vs 5% expected

Ann Arbor activity & plain stats

Permits in scored set
10
Last 3 years
3
Last 12 months
0
Years active
7
2012–2025
Median days to approval
33.0
peer median 10.5
Permits needing a revision
60%
Permits with a failed / re-inspection
60%
Inspections on record
32

Job mix

Kinds of work across all 10 permits. Each permit is scored against peers doing the same kind of work.

Roofing 30% (3)Remodels 30% (3)Decks & porches 20% (2)Windows & doors 10% (1)Additions / ADUs 10% (1)

Sample permit records

A sample of the public records behind this card. Links open the city's permit portals.

PermitKind of workAppliedStatusDays to approvalNotes
BLDGR25-0073Remodels2025-01-15Final59inspection Final [BLD]: Re-inspection required
inspection Insulation [BLD]: Re-inspection required
inspection Rough-In [BLD]: Re-inspection required
plan submittal v1 requires re-submit
BLDGR24-2231Decks & porches2024-10-14Final152inspection Rough-In [BLD]: Re-inspection required
plan submittal v2 requires re-submit
plan submittal v1 requires re-submit
30 eReview file(s) sent back for resubmittal
Permit placed on hold for more information
BLDG17-2046Additions / ADUs2017-08-31EXPIRED40inspection **FINAL: FAILED
inspection ROUGH: NOT READY
inspection FOOTING: FAILED
revision review: APPROVED
permit expired without final
BLDG16-1241Roofing2016-06-23EXPIRED0permit expired without final
BLDG13-1734Roofing2013-08-27FINALED0—
BLDG12-0789Roofing2012-05-14FINALED0—

Related Mixed / general firms

39D
R Fowler Construction
Mixed / general work · No single kind of work is 50%+ of last-3-year permits
Saline, MI · 140 permits · 98 in last 3 yrs · active 2022–2026
activefeaturedhigh confidence
41D
By The River Carpentry LLC
Mixed / general work · No single kind of work is 50%+ of all permits
Ann Arbor, MI · 47 permits · 9 in last 3 yrs · active 2015–2026
activefeaturedhigh confidence
41D
Crystal International Corp
Mixed / general work · No single kind of work is 50%+ of all permits
Madison Heights, MI · 17 permits · 9 in last 3 yrs · active 2015–2026
activefeaturedhigh confidence
42C−
O|X Studio, Inc.
Mixed / general work · No single kind of work is 50%+ of all permits
Ann Arbor, MI · 18 permits · 8 in last 3 yrs · active 2008–2025
occasionalhigh confidence
43C−
ICON Restoration of Southern Michigan
Mixed / general work · No single kind of work is 50%+ of all permits
Rockwood, MI · 7 permits · 5 in last 3 yrs · active 2023–2026
activelow confidence

See all ratings · How scores work

Scores update as new permit activity lands. Not a recommendation to hire. Report an error.