43C−
90% range 41.2–50.4
ICON Restoration of Southern Michigan
Primary kind of workMixed / general
activelow confidence
Sub-scores
Inspections31
worse than peers
Failed / re-inspection results on 45% of inspections vs 12% expected for similar jobs
Plan quality / Revisions55
better than peers
0.84 plan send-backs / revision events per permit vs 1.30 expected for similar jobs
Time to permit45
worse than peers
Median 18 days to approval vs 17 days peer median (1.61× after adjusting for kind of work)
Completion—
not enough data
More: compliance & reliability
Compliance49
typical
0.08 license/insurance/stop-work type holds per permit vs 0.07 expected
Reliability52
typical
4% of inspections cancelled vs 4% expected
Ann Arbor activity & plain stats
Permits in scored set
7
Last 3 years
5
Last 12 months
1
Years active
4
2023–2026
Median days to approval
18
peer median 17.0
Permits needing a revision
43%
Permits with a failed / re-inspection
43%
Inspections on record
14
Job mix
Additions / ADUs 29% Remodels 29% Garages & accessory 14% Commercial alterations 14% Roofing 14%
Sample permit records
| Permit | Kind of work | Applied | Status | Days to approval | Notes |
|---|---|---|---|---|---|
| BLDGR23-0057 | Garages & accessory | 2023-01-12 | Final | 295 | inspection Final [BLD]: Re-inspection required inspection Open Hole Inspection [BLD]: Re-inspection required inspection Rough-In [BLD]: Re-inspection required plan submittal v3 requires re-submit plan submittal v1 requires re-submit plan submittal v2 requires re-submit |
| BLDGR26-1622 | Remodels | 2026-10-02 | Issued | 18 | inspection Insulation [BLD]: Re-inspection required inspection Rough-In [BLD]: Re-inspection required Permit placed on hold for more information |
| BLDGC25-0150 | Commercial alterations | 2025-04-09 | Final | 33 | 2 eReview file(s) sent back for resubmittal |
| BLDGR23-2065 | Roofing | 2023-10-16 | Final | 15 | inspection Rough-In [BLD]: Partial Pass |
| BLDGR24-2293 | Additions / ADUs | 2024-10-22 | Void - Wrong Workclass | — | — |
| BLDGR24-2296 | Additions / ADUs | 2024-10-22 | Withdrawn | — | — |
Related Mixed / general firms
44C−
Scope Design & Build, LLC
Mixed / general work
occasionalmedium confidence
44C−
Magoon Cameron Shawn
Mixed / general work
occasionalhigh confidence
44C−
THOMAS BROTHERS PAINTING
Mixed / general work
occasionallow confidence
42C−
O|X Studio, Inc.
Mixed / general work
occasionalhigh confidence
45C
Jazer Construction Company LLC
Mixed / general work
occasionalmedium confidence