Ann Arbor Permit Report Cards

← All ratings

46
90% range 44.1–49.6

Millman Development Group Inc

General Contractor · Ann Arbor, MI · #374 of 440 listed overall
Primary kind of workMixed / generalNo single kind of work is 50%+ of all permits · #85 of 100 mixed / general firms
activefeaturedhigh confidence

Overall score: 50 = peer average for the same role and the same kind of work (e.g. window jobs are compared with window jobs, remodels with remodels). Based on 28 permits (12 STREAM + 16 A2Trak).

Sub-scores

Inspections55
better than peers
Failed / re-inspection results on 14% of inspections vs 19% expected for similar jobs
Plan quality / Revisions45
worse than peers
1.32 plan send-backs / revision events per permit vs 0.99 expected for similar jobs
Time to permit54
typical
Median 14 days to approval vs 17 days peer median (0.80× after adjusting for kind of work)
Completion26
worse than peers
62% of issued permits expired/voided without final vs 17% expected
More: compliance & reliability
Compliance46
typical
0.06 license/insurance/stop-work type holds per permit vs 0.05 expected
Reliability42
worse than peers
11% of inspections cancelled vs 7% expected

Ann Arbor activity & plain stats

Permits in scored set
28
Last 3 years
8
Last 12 months
2
Years active
14
2009–2026
Median days to approval
14
peer median 17.0
Permits needing a revision
29%
Permits with a failed / re-inspection
25%
Inspections on record
82

Job mix

Kinds of work across all 28 permits. Each permit is scored against peers doing the same kind of work.

Additions / ADUs 36% (10)Remodels 29% (8)New homes 14% (4)Roofing 11% (3)Windows & doors 4% (1)Garages & accessory 4% (1)Decks & porches 4% (1)

Score by kind of work

Additions / ADUs · 10 permits
50
Remodels · 8 permits
47

Shown for kinds of work with 5+ permits. 50 = peer average for that kind of work.

Sample permit records

A sample of the public records behind this card. Links open the city's permit portals.

PermitKind of workAppliedStatusDays to approvalNotes
BLDGR25-1803Additions / ADUs2025-10-23Expired42plan submittal v1 requires re-submit
plan submittal v2 requires re-submit
3 eReview file(s) sent back for resubmittal
Permit placed on hold for more information
permit expired without final
BLDG20-0756New homes2020-06-05FINALED12inspection **FINAL: FAILED
inspection SLAB: CONDITIONAL APPROVAL
inspection INSULATION: CONDITIONAL APPROVAL
inspection INSULATION: PARTIAL PASS
inspection ROUGH: CONDITIONAL APPROVAL
inspection POSTHOLE: CONDITIONAL APPROVAL
BLDG10-0091New homes2010-01-29FINALED28inspection **FINAL: FAILED
inspection INSULATION: FAILED
inspection SLAB: CONDITIONAL APPROVAL
inspection FLASHING: FAILED
BLDGR23-2077Remodels2023-10-17Final2—
BLDG19-2578Remodels2019-12-03FINALED0—
BLDG09-2246New homes2009-11-05FINALED4—

Related Mixed / general firms

See all ratings · How scores work

Scores update as new permit activity lands. Not a recommendation to hire. Report an error.