Ann Arbor Permit Report Cards

← All ratings

47
90% range 44.5–50.6

Miller Building LLC

General Contractor · Ann Arbor, MI · #355 of 440 listed overall
Primary kind of workMixed / generalNo single kind of work is 50%+ of all permits · #78 of 100 mixed / general firms
activefeaturedhigh confidence

Overall score: 50 = peer average for the same role and the same kind of work (e.g. window jobs are compared with window jobs, remodels with remodels). Based on 34 permits (11 STREAM + 23 A2Trak).

Sub-scores

Inspections61
better than peers
Failed / re-inspection results on 13% of inspections vs 23% expected for similar jobs
Plan quality / Revisions37
worse than peers
1.47 plan send-backs / revision events per permit vs 0.77 expected for similar jobs
Time to permit48
typical
Median 22 days to approval vs 25 days peer median (1.09× after adjusting for kind of work)
Completion51
typical
14% of issued permits expired/voided without final vs 14% expected
More: compliance & reliability
Compliance34
worse than peers
0.21 license/insurance/stop-work type holds per permit vs 0.09 expected
Reliability42
worse than peers
10% of inspections cancelled vs 7% expected

Ann Arbor activity & plain stats

Permits in scored set
34
Last 3 years
3
Last 12 months
1
Years active
14
2011–2026
Median days to approval
22
peer median 25.0
Permits needing a revision
50%
Permits with a failed / re-inspection
50%
Inspections on record
193

Job mix

Kinds of work across all 34 permits. Each permit is scored against peers doing the same kind of work.

New homes 44% (15)Remodels 32% (11)Additions / ADUs 9% (3)Decks & porches 6% (2)Roofing 3% (1)Radon 3% (1)Garages & accessory 3% (1)

Score by kind of work

New homes · 15 permits
47
Remodels · 11 permits
45

Shown for kinds of work with 5+ permits. 50 = peer average for that kind of work.

Sample permit records

A sample of the public records behind this card. Links open the city's permit portals.

PermitKind of workAppliedStatusDays to approvalNotes
BLDG11-1826Remodels2011-10-10FINALED—inspection INSULATION: PARTIAL PASS
inspection ROUGH: PARTIAL PASS
inspection ROUGH: FAILED
inspection FOOTING: PARTIAL PASS
inspection CONCEALED SPACE: PARTIAL PASS
inspection PARTIAL ROUGH: NOT READY
BLDGR22-2669New homes2022-06-22Withdrawn65plan submittal v4 requires re-submit
plan submittal v2 requires re-submit
plan submittal v3 requires re-submit
plan submittal v1 requires re-submit
6 eReview file(s) sent back for resubmittal
BLDG21-1334New homes2021-07-12FINALED28inspection ROUGH: CONDITIONAL APPROVAL
inspection INSULATION: CONDITIONAL APPROVAL
inspection FOUNDATION/REBAR: PARTIAL PASS
review GRADING: HOLD
review PLAN REVIEW: HOLD
review PLAN REVIEW: COMMENTS ISSUED
BLDG14-1846Remodels2014-09-15CANCELLED——
BLDG14-1618Roofing2014-08-19FINALED0—
BLDG12-2105Decks & porches2012-10-11FINALED7—

Related Mixed / general firms

See all ratings · How scores work

Scores update as new permit activity lands. Not a recommendation to hire. Report an error.