Ann Arbor Permit Report Cards

← All ratings

52B−
90% range 49.2–55.8

Kyle Marsh

Architect · Dexter, MI · #53 of 119 listed overall
Primary kind of workAdditions / ADUs83% of all permits · #7 of 7 additions / adus specialists
activelow confidence

Overall score: 50 = peer average for the same role and the same kind of work (e.g. window jobs are compared with window jobs, remodels with remodels). Based on 6 permits (4 STREAM + 2 A2Trak).

Sub-scores

Inspections59
better than peers
Failed / re-inspection results on 9% of inspections vs 16% expected for similar jobs
Plan quality / Revisions48
typical
2.34 plan send-backs / revision events per permit vs 1.92 expected for similar jobs
Time to permit47
typical
Median 23 days to approval vs 38.5 days peer median (1.35× after adjusting for kind of work)
Completion—
not enough data
More: compliance & reliability
Compliance59
better than peers
0.04 license/insurance/stop-work type holds per permit vs 0.19 expected
Reliability53
typical
5% of inspections cancelled vs 6% expected

Ann Arbor activity & plain stats

Permits in scored set
6
Last 3 years
4
Last 12 months
2
Years active
4
2014–2026
Median days to approval
23.0
peer median 38.5
Permits needing a revision
50%
Permits with a failed / re-inspection
67%
Inspections on record
44

Job mix

Kinds of work across all 6 permits. Each permit is scored against peers doing the same kind of work.

Additions / ADUs 83% (5)New homes 17% (1)

Sample permit records

A sample of the public records behind this card. Links open the city's permit portals.

PermitKind of workAppliedStatusDays to approvalNotes
BLDGR24-2276New homes2024-10-18Issued691plan submittal v1 requires re-submit
plan submittal v3 requires re-submit
plan submittal v2 requires re-submit
4 eReview file(s) sent back for resubmittal
Permit placed on hold for more information
BLDGR24-0560Additions / ADUs2024-03-19Final134inspection Final [BLD]: Partial Pass
inspection Rough-In [BLD]: Partial Pass
plan submittal v1 requires re-submit
1 eReview file(s) sent back for resubmittal
Permit placed on hold for more information
BLDGR26-0418Additions / ADUs2026-03-26Issued25inspection Footing [BLD]: Partial Pass
plan submittal v1 requires re-submit
3 eReview file(s) sent back for resubmittal
BLDG14-1089Additions / ADUs2014-06-23EXPIRED4inspection ROUGH: FAILED
inspection BACKFILL: FAILED
permit expired without final
BLDGR26-0192Additions / ADUs2026-02-13Issued21inspection Footing [BLD]: Partial Pass
BLDG15-1511Additions / ADUs2015-07-21FINALED13—

Related Additions / ADUs firms

54B
J.T.Zeigler, LLC
Additions / ADUs · 60% of all permits
Ann Arbor, MI · 10 permits · 5 in last 3 yrs · active 2021–2026
activefeaturedmedium confidence
54B
Studio Z Architecture
Additions / ADUs · 67% of all permits
Canton, MI · 9 permits · 2 in last 3 yrs · active 2014–2024
occasionalmedium confidence
54B
Architectural Resource
Additions / ADUs · 71% of all permits
Ann Arbor, MI · 7 permits · 1 in last 3 yrs · active 2015–2024
occasionallow confidence
55B
The Kolb Company, LLC
Additions / ADUs · 80% of all permits
Pinckney, MI · 5 permits · 4 in last 3 yrs · active 2014–2025
occasionallow confidence
55B
PLY+
Additions / ADUs · 60% of all permits
Ann Arbor, MI · 5 permits · 4 in last 3 yrs · active 2023–2026
activelow confidence

See all ratings · How scores work

Scores update as new permit activity lands. Not a recommendation to hire. Report an error.