Ann Arbor Permit Report Cards

← All ratings

50C+
90% range 45.8–55.1

Homeland Solar

General Contractor · Ann Arbor, MI · #287 of 440 listed overall
Primary kind of workSolar / EV100% of last-3-year permits · #6 of 9 solar / ev specialists
activefeaturedhigh confidence

Overall score: 50 = peer average for the same role and the same kind of work (e.g. window jobs are compared with window jobs, remodels with remodels). Based on 51 permits (51 STREAM).

Sub-scores

Inspections50
typical
Failed / re-inspection results on 23% of inspections vs 22% expected for similar jobs
Plan quality / Revisions48
typical
0.81 plan send-backs / revision events per permit vs 0.76 expected for similar jobs
Time to permit48
typical
Median 16 days to approval vs 16 days peer median (1.10× after adjusting for kind of work)
Completion52
typical
25% of issued permits expired/voided without final vs 28% expected
More: compliance & reliability
Compliance46
typical
0.18 license/insurance/stop-work type holds per permit vs 0.15 expected
Reliability62
better than peers
2% of inspections cancelled vs 3% expected

Ann Arbor activity & plain stats

Permits in scored set
51
Last 3 years
33
Last 12 months
11
Years active
5
2022–2026
Median days to approval
16
peer median 16.0
Permits needing a revision
49%
Permits with a failed / re-inspection
18%
Inspections on record
65

Job mix

Kinds of work across all 51 permits. Each permit is scored against peers doing the same kind of work.

Solar / EV 100% (51)

Sample permit records

A sample of the public records behind this card. Links open the city's permit portals.

PermitKind of workAppliedStatusDays to approvalNotes
BLDGC23-0089Solar / EV2023-02-15Expired147inspection Rough-In [BLD]: Re-inspection required
plan submittal v3 requires re-submit
plan submittal v2 requires re-submit
plan submittal v1 requires re-submit
4 eReview file(s) sent back for resubmittal
permit expired without final
BLDGC25-0430Solar / EV2025-10-13Issued39inspection Final [BLD]: Re-inspection required
inspection Footing [BLD]: Re-inspection required
plan submittal v1 requires re-submit
4 eReview file(s) sent back for resubmittal
BLDGC24-0036Solar / EV2024-02-02Expired18inspection Footing [BLD]: Re-inspection required
plan submittal v1 requires re-submit
1 eReview file(s) sent back for resubmittal
permit expired without final
BLDGC25-0248Solar / EV2025-05-27Final42—
BLDGC25-0020Solar / EV2025-01-21Final48—
BLDGC24-0547Solar / EV2024-10-22Final2—

Related Solar / EV firms

48C+
Duane Lobbestael
Solar / EV · 67% of all permits
Holly, MI · 6 permits · 6 in last 3 yrs · active 2024–2025
occasionallow confidence
52B−
Dan Combs Consulting Inc
Solar / EV · 50% of all permits
Waterford, MI · 8 permits · 1 in last 3 yrs · active 2011–2023
occasionalmedium confidence
52B−
TELCOM CONSTRUCTION SERVICES INC
Solar / EV · 80% of all permits
Lansdale, PA · 5 permits · 5 in last 3 yrs · active 2024–2026
activelow confidence
53B−
BRS Field Ops, LLC
Solar / EV · 100% of all permits
Orem, UT · 6 permits · 2 in last 3 yrs · active 2023–2024
occasionallow confidence
46C
Mastec
Solar / EV · 77% of last-3-year permits
Batavia, IL · 13 permits · 13 in last 3 yrs · active 2023–2026
activefeaturedmedium confidence

See all ratings · How scores work

Scores update as new permit activity lands. Not a recommendation to hire. Report an error.