Ann Arbor Permit Report Cards

← All ratings

48C+
90% range 46.4–50.1

Duane Lobbestael

General Contractor · Holly, MI · #333 of 440 listed overall
Primary kind of workSolar / EV67% of all permits · #7 of 9 solar / ev specialists
occasionallow confidence

Overall score: 50 = peer average for the same role and the same kind of work (e.g. window jobs are compared with window jobs, remodels with remodels). Based on 6 permits (6 STREAM).

Sub-scores

Inspections46
typical
Failed / re-inspection results on 29% of inspections vs 20% expected for similar jobs
Plan quality / Revisions42
worse than peers
1.63 plan send-backs / revision events per permit vs 0.91 expected for similar jobs
Time to permit42
worse than peers
Median 30.5 days to approval vs 16 days peer median (2.25× after adjusting for kind of work)
Completion62
better than peers
0% of issued permits expired/voided without final vs 22% expected
More: compliance & reliability
Compliance48
typical
0.16 license/insurance/stop-work type holds per permit vs 0.13 expected
Reliability59
better than peers
0% of inspections cancelled vs 4% expected

Ann Arbor activity & plain stats

Permits in scored set
6
Last 3 years
6
Last 12 months
0
Years active
2
2024–2025
Median days to approval
30.5
peer median 16.0
Permits needing a revision
67%
Permits with a failed / re-inspection
33%
Inspections on record
7

Job mix

Kinds of work across all 6 permits. Each permit is scored against peers doing the same kind of work.

Solar / EV 67% (4)Commercial alterations 17% (1)Remodels 17% (1)

Sample permit records

A sample of the public records behind this card. Links open the city's permit portals.

PermitKind of workAppliedStatusDays to approvalNotes
BLDGC25-0322Commercial alterations2025-07-10Final33inspection Final [BLD]: Re-inspection required
plan submittal v1 requires re-submit
3 eReview file(s) sent back for resubmittal
BLDGC24-0131Solar / EV2024-04-09Requires Resubmit—plan submittal v2 requires re-submit
plan submittal v1 requires re-submit
Permit placed on hold for more information
BLDGC24-0316Solar / EV2024-07-18Final28plan submittal v1 requires re-submit
4 eReview file(s) sent back for resubmittal
BLDGC24-0315Solar / EV2024-07-18Final262 eReview file(s) sent back for resubmittal
Permit placed on hold for more information
BLDGC24-0603Solar / EV2024-12-02Final104inspection Final [BLD]: Re-inspection required
BLDGR25-1100Remodels2025-07-03Void - Wrong Workclass——

Related Solar / EV firms

50C+
Homeland Solar
Solar / EV · 100% of last-3-year permits
Ann Arbor, MI · 51 permits · 33 in last 3 yrs · active 2022–2026
activefeaturedhigh confidence
46C
Mastec
Solar / EV · 77% of last-3-year permits
Batavia, IL · 13 permits · 13 in last 3 yrs · active 2023–2026
activefeaturedmedium confidence
52B−
Dan Combs Consulting Inc
Solar / EV · 50% of all permits
Waterford, MI · 8 permits · 1 in last 3 yrs · active 2011–2023
occasionalmedium confidence
52B−
TELCOM CONSTRUCTION SERVICES INC
Solar / EV · 80% of all permits
Lansdale, PA · 5 permits · 5 in last 3 yrs · active 2024–2026
activelow confidence
53B−
BRS Field Ops, LLC
Solar / EV · 100% of all permits
Orem, UT · 6 permits · 2 in last 3 yrs · active 2023–2024
occasionallow confidence

See all ratings · How scores work

Scores update as new permit activity lands. Not a recommendation to hire. Report an error.