43
90% range 40.7–45.5
FAIRWAY ENGINEERING LLC
Primary kind of workWindows & doors
occasionallow confidence
Sub-scores
Inspections37
worse than peers
Failed / re-inspection results on 61% of inspections vs 20% expected for similar jobs
Plan quality / Revisions60
better than peers
0.17 plan send-backs / revision events per permit vs 0.64 expected for similar jobs
Time to permit21
worse than peers
Median 66 days to approval vs 3 days peer median (18.55× after adjusting for kind of work)
Completion22
worse than peers
51% of issued permits expired/voided without final vs 8% expected
More: compliance & reliability
Compliance34
worse than peers
0.21 license/insurance/stop-work type holds per permit vs 0.06 expected
Reliability60
better than peers
0% of inspections cancelled vs 3% expected
Ann Arbor activity & plain stats
Permits in scored set
6
Last 3 years
5
Last 12 months
0
Years active
2
2023–2024
Median days to approval
66.0
peer median 3.0
Permits needing a revision
17%
Permits with a failed / re-inspection
67%
Inspections on record
9
Job mix
Windows & doors 100%
Sample permit records
| Permit | Kind of work | Applied | Status | Days to approval | Notes |
|---|---|---|---|---|---|
| BLDGC23-0408 | Windows & doors | 2023-09-06 | Final | 133 | inspection Final [BLD]: Re-inspection required inspection Final [BLD]: Partial Pass |
| BLDGC24-0292 | Windows & doors | 2024-04-28 | Expired | 66 | inspection Final [BLD]: Re-inspection required permit expired without final |
| BLDGC24-0293 | Windows & doors | 2024-04-28 | Expired | 66 | inspection Final [BLD]: Re-inspection required permit expired without final |
| BLDGC24-0294 | Windows & doors | 2024-04-28 | Expired | 66 | inspection Final [BLD]: Re-inspection required permit expired without final |
| BLDGC24-0183 | Windows & doors | 2024-04-28 | Final | 64 | 2 eReview file(s) sent back for resubmittal |
| BLDGC24-0295 | Windows & doors | 2024-04-28 | Final | 66 | — |