48
90% range 44.3–52.4
Damian Farrell Design Group PLLC
Primary kind of workCommercial alterations
activefeaturedhigh confidence
Sub-scores
Inspections51
typical
Failed / re-inspection results on 19% of inspections vs 20% expected for similar jobs
Plan quality / Revisions48
typical
1.49 plan send-backs / revision events per permit vs 1.37 expected for similar jobs
Time to permit44
worse than peers
Median 27 days to approval vs 17 days peer median (1.35× after adjusting for kind of work)
Completion55
typical
9% of issued permits expired/voided without final vs 12% expected
More: compliance & reliability
Compliance42
worse than peers
0.17 license/insurance/stop-work type holds per permit vs 0.11 expected
Reliability51
typical
5% of inspections cancelled vs 5% expected
Ann Arbor activity & plain stats
Permits in scored set
38
Last 3 years
18
Last 12 months
4
Years active
12
2010–2026
Median days to approval
27
peer median 17.0
Permits needing a revision
60%
Permits with a failed / re-inspection
42%
Inspections on record
159
Job mix
Commercial alterations 63% Remodels 11% Additions / ADUs 8% Windows & doors 5% Commercial new 3% Decks & porches 3% Roofing 3% Foundation / structural 3% Siding / envelope 3%
Sample permit records
| Permit | Kind of work | Applied | Status | Days to approval | Notes |
|---|---|---|---|---|---|
| BLDG19-1271 | Commercial alterations | 2019-07-08 | FINALED | 86 | inspection **FINAL: FAILED inspection ABOVE CEILING/GRID: NOT READY inspection ROUGH: CONDITIONAL APPROVAL revision review: APPROVED review REVISION: HOLD review PLAN REVIEW: COMMENTS ISSUED |
| BLDG20-0612 | Commercial alterations | 2020-04-28 | FINALED | 350 | inspection **FINAL: CONDITIONAL APPROVAL inspection **FINAL: FAILED review GRADING: HOLD |
| BLDGR24-0883 | Additions / ADUs | 2024-04-24 | Final | 35 | inspection Compaction [BLD]: Re-inspection required inspection Footing [BLD]: Partial Pass inspection Insulation [BLD]: Partial Pass inspection Rough-In [BLD]: Re-inspection required |
| BLDG19-2620 | Commercial alterations | 2019-12-06 | FINALED | 28 | — |
| BLDG15-0403 | Remodels | 2015-03-26 | FINALED | 18 | — |
| BLDG12-2457 | Commercial alterations | 2012-11-30 | FINALED | 10 | — |