Ann Arbor Permit Report Cards

← All ratings

52
90% range 47.7–57.1

Spence Brothers

General Contractor · Ann Arbor, MI · #238 of 440 listed overall
Primary kind of workCommercial alterations62% of all permits · #33 of 70 commercial alterations specialists
occasionalhigh confidence

Overall score: 50 = peer average for the same role and the same kind of work (e.g. window jobs are compared with window jobs, remodels with remodels). Based on 39 permits (3 STREAM + 36 A2Trak).

Sub-scores

Inspections51
typical
Failed / re-inspection results on 42% of inspections vs 44% expected for similar jobs
Plan quality / Revisions46
typical
1.01 plan send-backs / revision events per permit vs 0.84 expected for similar jobs
Time to permit46
typical
Median 38.5 days to approval vs 16 days peer median (1.24× after adjusting for kind of work)
Completion54
typical
14% of issued permits expired/voided without final vs 18% expected
More: compliance & reliability
Compliance66
better than peers
0.02 license/insurance/stop-work type holds per permit vs 0.05 expected
Reliability42
worse than peers
12% of inspections cancelled vs 8% expected

Ann Arbor activity & plain stats

Permits in scored set
39
Last 3 years
2
Last 12 months
1
Years active
15
2009–2026
Median days to approval
38.5
peer median 16.0
Permits needing a revision
46%
Permits with a failed / re-inspection
62%
Inspections on record
966

Job mix

Kinds of work across all 39 permits. Each permit is scored against peers doing the same kind of work.

Commercial alterations 62% (24)Commercial new 28% (11)Remodels 8% (3)Decks & porches 3% (1)

Score by kind of work

Commercial alterations · 24 permits
55
Commercial new · 11 permits
49

Shown for kinds of work with 5+ permits. 50 = peer average for that kind of work.

Sample permit records

A sample of the public records behind this card. Links open the city's permit portals.

PermitKind of workAppliedStatusDays to approvalNotes
BLDG16-1590Commercial new2016-08-03FINALED69inspection **FINAL: PARTIAL PASS
inspection PARTIAL FINAL: FAILED
inspection PARTIAL FINAL: PARTIAL PASS
BLDG17-0054Commercial new2017-01-13FINALED145inspection **FINAL: PARTIAL PASS
inspection PARTIAL FINAL: PARTIAL PASS
inspection TEMP COFO: CONDITIONAL APPROVAL
BLDG10-1317Commercial new2010-08-05EXPIRED102inspection CONCEALED SPACE: PARTIAL PASS
inspection ABOVE CEILING/GRID: PARTIAL PASS
inspection CONCEALED SPACE: FAILED
inspection DRYWALL-SCREW: FAILED
inspection ABOVE CEILING/GRID: FAILED
BLDG13-2134Commercial alterations2013-10-14FINALED13—
BLDG12-1660Remodels2012-08-28FINALED122—
BLDG11-1190Commercial alterations2011-07-26FINALED16—

Related Commercial alterations firms

See all ratings · How scores work

Scores update as new permit activity lands. Not a recommendation to hire. Report an error.