63A−
90% range 59.5–66.3
Forward Design Build
Primary kind of workRemodels
activefeaturedhigh confidence
Sub-scores
Inspections61
better than peers
Failed / re-inspection results on 7% of inspections vs 11% expected for similar jobs
Plan quality / Revisions51
typical
1.08 plan send-backs / revision events per permit vs 1.12 expected for similar jobs
Time to permit51
typical
Median 20 days to approval vs 17 days peer median (0.96× after adjusting for kind of work)
Completion81
better than peers
2% of issued permits expired/voided without final vs 12% expected
More: compliance & reliability
Compliance82
better than peers
0.01 license/insurance/stop-work type holds per permit vs 0.06 expected
Reliability46
typical
6% of inspections cancelled vs 5% expected
Ann Arbor activity & plain stats
Permits in scored set
90
Last 3 years
58
Last 12 months
23
Years active
5
2022–2026
Median days to approval
20
peer median 17.0
Permits needing a revision
44%
Permits with a failed / re-inspection
27%
Inspections on record
336
Job mix
Remodels 70% Additions / ADUs 18% Garages & accessory 4% Decks & porches 3% Windows & doors 2% Roofing 1% New homes 1%
Score by kind of work
Remodels · 63 permits
65
Additions / ADUs · 16 permits
58
Sample permit records
| Permit | Kind of work | Applied | Status | Days to approval | Notes |
|---|---|---|---|---|---|
| BLDGR23-1980 | Additions / ADUs | 2023-10-05 | Final | 48 | inspection Drywall - Screw [BLD]: Partial Pass inspection Final [BLD]: Partial Pass inspection Insulation [BLD]: Re-inspection required inspection Rough-In [BLD]: Partial Pass inspection Rough-In [BLD]: Re-inspection required plan submittal v1 requires re-submit |
| BLDGR24-0071 | Garages & accessory | 2024-01-17 | Final | 36 | plan submittal v3 requires re-submit plan submittal v1 requires re-submit plan submittal v2 requires re-submit 4 eReview file(s) sent back for resubmittal Permit placed on hold for more information |
| BLDGR22-3309 | Remodels | 2022-09-28 | Final | 54 | inspection Concealed Space [BLD]: Partial Pass inspection Final [BLD]: Partial Pass plan submittal v1 requires re-submit plan submittal v3 requires re-submit plan submittal v2 requires re-submit 4 eReview file(s) sent back for resubmittal |
| BLDGR22-2338 | Remodels | 2022-05-11 | Final | 17 | — |
| BLDGR22-2268 | Remodels | 2022-05-03 | Final | 13 | — |
| BLDGR22-2053 | Remodels | 2022-04-05 | Final | 14 | — |