Ann Arbor Permit Report Cards

← All ratings

49C+
90% range 44.9–54.2

Fletcher Contracting Group

General Contractor · Ann Arbor, MI · #300 of 440 listed overall
Primary kind of workMixed / generalNo single kind of work is 50%+ of all permits · #65 of 100 mixed / general firms
activefeaturedhigh confidence

Overall score: 50 = peer average for the same role and the same kind of work (e.g. window jobs are compared with window jobs, remodels with remodels). Based on 17 permits (16 STREAM + 1 A2Trak).

Sub-scores

Inspections46
typical
Failed / re-inspection results on 15% of inspections vs 12% expected for similar jobs
Plan quality / Revisions40
worse than peers
1.55 plan send-backs / revision events per permit vs 0.90 expected for similar jobs
Time to permit40
worse than peers
Median 18 days to approval vs 17 days peer median (1.82× after adjusting for kind of work)
Completion61
better than peers
6% of issued permits expired/voided without final vs 13% expected
More: compliance & reliability
Compliance66
better than peers
0.02 license/insurance/stop-work type holds per permit vs 0.06 expected
Reliability50
typical
4% of inspections cancelled vs 4% expected

Ann Arbor activity & plain stats

Permits in scored set
17
Last 3 years
8
Last 12 months
2
Years active
5
2022–2026
Median days to approval
18.0
peer median 17.0
Permits needing a revision
71%
Permits with a failed / re-inspection
41%
Inspections on record
61

Job mix

Kinds of work across all 17 permits. Each permit is scored against peers doing the same kind of work.

Remodels 41% (7)Windows & doors 24% (4)Garages & accessory 12% (2)Roofing 6% (1)Decks & porches 6% (1)Commercial alterations 6% (1)Additions / ADUs 6% (1)

Sample permit records

A sample of the public records behind this card. Links open the city's permit portals.

PermitKind of workAppliedStatusDays to approvalNotes
BLDGC23-0053Commercial alterations2023-02-02Final592inspection Final [BLD]: Re-inspection required
inspection Rough-In [BLD]: Partial Pass
plan submittal v1 requires re-submit
plan submittal v2 requires re-submit
12 eReview file(s) sent back for resubmittal
BLDGR22-3049Remodels2022-08-18Final55inspection Fire Stopping [BLD]: Re-inspection required
inspection Rough-In [BLD]: Re-inspection required
inspection Rough-In [BLD]: Partial Pass
plan submittal v1 requires re-submit
2 eReview file(s) sent back for resubmittal
BLDGR26-0397Additions / ADUs2026-03-23Issued24plan submittal v1 requires re-submit
4 eReview file(s) sent back for resubmittal
Permit placed on hold for more information
BLDGC24-0249Windows & doors2024-06-12Final4—
BLDGR25-0310Remodels2025-03-04Final13—
BLDG22-0301Windows & doors2022-02-16FINALED9—

Related Mixed / general firms

49C+
Bold Construction
Mixed / general work · No single kind of work is 50%+ of all permits
Ypsilanti, MI · 7 permits · 3 in last 3 yrs · active 2022–2026
activelow confidence
49C+
Encore
Mixed / general work · No single kind of work is 50%+ of last-3-year permits
Manchester, MI · 20 permits · 17 in last 3 yrs · active 2022–2026
activefeaturedhigh confidence
49C+
So Unique Contracting
Mixed / general work · No single kind of work is 50%+ of all permits
Chelsea, MI · 5 permits · 4 in last 3 yrs · active 2023–2025
occasionallow confidence
50C+
Budd's General Contracting
Mixed / general work · No single kind of work is 50%+ of all permits
Milan, MI · 13 permits · 4 in last 3 yrs · active 2008–2025
occasionalmedium confidence
49C+
Steven J Lucchesi Inc
Mixed / general work · No single kind of work is 50%+ of all permits
Ann Arbor, MI · 24 permits · 7 in last 3 yrs · active 2008–2025
occasionalhigh confidence

See all ratings · How scores work

Scores update as new permit activity lands. Not a recommendation to hire. Report an error.