Ann Arbor Permit Report Cards

← All ratings

54
90% range 51.3–58.6

Fireside Home Construction LLC

General Contractor · Dexter, MI · #153 of 440 listed overall
Primary kind of workMixed / generalNo single kind of work is 50%+ of all permits · #30 of 100 mixed / general firms
activefeaturedhigh confidence

Overall score: 50 = peer average for the same role and the same kind of work (e.g. window jobs are compared with window jobs, remodels with remodels). Based on 31 permits (11 STREAM + 20 A2Trak).

Sub-scores

Inspections53
typical
Failed / re-inspection results on 15% of inspections vs 18% expected for similar jobs
Plan quality / Revisions48
typical
0.67 plan send-backs / revision events per permit vs 0.60 expected for similar jobs
Time to permit40
worse than peers
Median 17 days to approval vs 12 days peer median (1.71× after adjusting for kind of work)
Completion72
better than peers
4% of issued permits expired/voided without final vs 19% expected
More: compliance & reliability
Compliance62
better than peers
0.02 license/insurance/stop-work type holds per permit vs 0.04 expected
Reliability45
worse than peers
8% of inspections cancelled vs 6% expected

Ann Arbor activity & plain stats

Permits in scored set
31
Last 3 years
5
Last 12 months
2
Years active
12
2009–2026
Median days to approval
17.0
peer median 12.0
Permits needing a revision
45%
Permits with a failed / re-inspection
48%
Inspections on record
161

Job mix

Kinds of work across all 31 permits. Each permit is scored against peers doing the same kind of work.

Remodels 42% (13)Additions / ADUs 16% (5)Commercial alterations 10% (3)Roofing 10% (3)Windows & doors 10% (3)Garages & accessory 6% (2)Decks & porches 3% (1)Foundation / structural 3% (1)

Score by kind of work

Remodels · 13 permits
55
Additions / ADUs · 5 permits
50

Shown for kinds of work with 5+ permits. 50 = peer average for that kind of work.

Sample permit records

A sample of the public records behind this card. Links open the city's permit portals.

PermitKind of workAppliedStatusDays to approvalNotes
BLDG10-1801Additions / ADUs2010-10-07FINALED17inspection **FINAL: PARTIAL PASS
inspection INSULATION: CONDITIONAL APPROVAL
inspection INSULATION: FAILED
inspection ROUGH: PARTIAL PASS
inspection RADON: FAILED
inspection PARTIAL ROUGH: FAILED
BLDG09-0268Roofing2009-03-17FINALED17inspection **FINAL: FAILED
inspection INSULATION: FAILED
inspection INSULATION: CONDITIONAL APPROVAL
inspection ROUGH: PARTIAL PASS
inspection ROUGH: FAILED
BLDG19-0344Additions / ADUs2019-03-12FINALED14inspection **FINAL: CONDITIONAL APPROVAL
inspection INSULATION: CONDITIONAL APPROVAL
inspection COMPACTION: FAILED
BLDG19-1416Remodels2019-07-23FINALED8—
BLDG19-1407Remodels2019-07-22FINALED8—
BLDG17-0958Roofing2017-05-11FINALED0—

Related Mixed / general firms

See all ratings · How scores work

Scores update as new permit activity lands. Not a recommendation to hire. Report an error.