Ann Arbor Permit Report Cards

← All ratings

44
90% range 31.8–56.5

Bluebird CFW

General Contractor · Charlotte, MI · #397 of 440 listed overall
Primary kind of workFoundation / structural71% of all permits · #15 of 16 foundation / structural specialists
occasionallow confidence

Overall score: 50 = peer average for the same role and the same kind of work (e.g. window jobs are compared with window jobs, remodels with remodels). Based on 7 permits (6 STREAM + 1 A2Trak).

Sub-scores

Inspections51
typical
Failed / re-inspection results on 13% of inspections vs 14% expected for similar jobs
Plan quality / Revisions34
worse than peers
1.99 plan send-backs / revision events per permit vs 0.67 expected for similar jobs
Time to permit42
worse than peers
Median 22 days to approval vs 17 days peer median (1.89× after adjusting for kind of work)
Completion50
typical
15% of issued permits expired/voided without final vs 15% expected
More: compliance & reliability
Compliance42
worse than peers
0.07 license/insurance/stop-work type holds per permit vs 0.04 expected
Reliability48
typical
8% of inspections cancelled vs 6% expected

Ann Arbor activity & plain stats

Permits in scored set
7
Last 3 years
6
Last 12 months
0
Years active
3
2020–2025
Median days to approval
22
peer median 17.0
Permits needing a revision
71%
Permits with a failed / re-inspection
29%
Inspections on record
14

Job mix

Kinds of work across all 7 permits. Each permit is scored against peers doing the same kind of work.

Foundation / structural 71% (5)Windows & doors 14% (1)Remodels 14% (1)

Sample permit records

A sample of the public records behind this card. Links open the city's permit portals.

PermitKind of workAppliedStatusDays to approvalNotes
BLDGR24-1881Windows & doors2024-08-20Expired91inspection Drainage Connection [BLD]: Re-inspection required
plan submittal v1 requires re-submit
plan submittal v2 requires re-submit
4 eReview file(s) sent back for resubmittal
Permit placed on hold for more information
BLDGR25-1442Foundation / structural2025-08-29Final49plan submittal v1 requires re-submit
6 eReview file(s) sent back for resubmittal
BLDGR24-0449Foundation / structural2024-03-04Final22plan submittal v1 requires re-submit
Permit placed on hold for more information
BLDGR24-0530Foundation / structural2024-03-15Final10inspection Rough-In [BLD]: Partial Pass
1 eReview file(s) sent back for resubmittal
BLDGR24-2150Foundation / structural2024-10-03Final22—
BLDG20-1236Remodels2020-08-05FINALED13—

Related Foundation / structural firms

See all ratings · How scores work

Scores update as new permit activity lands. Not a recommendation to hire. Report an error.